Fire station in Germany
Good air and good work! - The VEX320T’s compact design made it possible to place the ventilation in the technical room on the ground floor
Project ID
Fire brigade moves in
The voluntary fire brigade Kematen moved into the new fire station in September 2020 after almost a year of construction.
With the “Probe” siren programme, the emergency services vehicles made their way into the new fire station. This was followed by a presentation of the new fire station, the house rules and the necessary new procedures.
Finally, a tour was conducted in small groups, where the members were familiarised with the new premises, facilities and processes in detail.
Products and solutions
The new building has been equipped with a ventilation system from EXHAUSTO A/S. In order to meet the technical requirements for a modern fire station, a VEX300T series ventilation unit has been installed in the new fire station.
In the main building, command rooms, changing rooms, emergency rooms and teaching rooms are ventilated and ventilated via a time program. Ventilation of changing rooms (for 75 people), teaching rooms (for 40 people) and emergency rooms (for 30 people) incl. kitchen is regulated with pressure control via zone damper depending on load.
Data
Built: | 2020 |
Type: | Office/workplace |
Dimensions of the project: | 200 m2 |
Manufactured by: | FF Kematen at Krems |
Planning and project management: | Koelberger Architects |
Installation steps: | Pauzenberger Installationstechnik GmbH |
VEX320T ventilates the changing room for up to 75 people
Product name of
VEX320T - Airflows – 90 – 4,100 m³/h
- Compact top units with counter flow heat exchanger
- Built-in heating or cooling coil
- Space saving solution
- Pre-filtering option
- Easy to maintain and service
- Can be transported through 90 cm. wide door