Project ID

Fire brigade moves in

The voluntary fire brigade Kematen moved into the new fire station in September 2020 after almost a year of construction.

With the “Probe” siren programme, the emergency services vehicles made their way into the new fire station. This was followed by a presentation of the new fire station, the house rules and the necessary new procedures.

Finally, a tour was conducted in small groups, where the members were familiarised with the new premises, facilities and processes in detail.

 

Products and solutions

The new building has been equipped with a ventilation system from EXHAUSTO A/S. In order to meet the technical requirements for a modern fire station, a VEX300T series ventilation unit has been installed in the new fire station.

In the main building, command rooms, changing rooms, emergency rooms and teaching rooms are ventilated and ventilated via a time program. Ventilation of changing rooms (for 75 people), teaching rooms (for 40 people) and emergency rooms (for 30 people) incl. kitchen is regulated with pressure control via zone damper depending on load.

Data

Built:2020
Type:Office/workplace
Dimensions of the project:200 m2
Manufactured by:FF Kematen at Krems
Planning and project management:Koelberger Architects
Installation steps:Pauzenberger Installationstechnik GmbH

 

Feuerwehr_gaderobe

VEX320T ventilates the changing room for up to 75 people

Product name of

VEX320T - Airflows – 90 – 4,100 m³/h

VEX320T_produkt
  • Compact top units with counter flow heat exchanger
  • Built-in heating or cooling coil
  • Space saving solution
  • Pre-filtering option
  • Easy to maintain and service
  • Can be transported through 90 cm. wide door